
Modernization at the Herbolzheim Training Center
After a long and intensive planning process, the mat system in Herbolzheim has been completely renewed. The old materials were entirely replaced with over 200 m² of new mats. During the renovation, the equipment was also rearranged and partially upgraded to the latest SPIETH models. This ensures that the performance center is optimally equipped for the coming years and can continue to provide excellent work in youth training.
Manuel Rothmann, Head of the Performance Center in Herbolzheim, expressed his satisfaction:
"The renovation of our artistic gymnastics hall by SPIETH was overall very successful. From planning to implementation, the collaboration was always open, transparent, and pleasant. We would especially like to highlight the high flexibility of the team: whenever unexpected challenges or changes arose, either in advance or on-site, they responded quickly and worked with us to find solutions. Even during the intensive installation phase, communication was excellent – questions were answered immediately, and we felt well supported throughout. The result is impressive in every respect: the hall now presents itself as modern, safe, and high-performing. The materials are of high quality, precisely installed, and provide our athletes with optimal training conditions to develop to their fullest potential."
We sincerely thank everyone for the excellent collaboration and wish the coaches and athletes much enjoyment in their training!